Summary for Test 2023-07-19-7-3
Test performed: AASHTO T269-14Project Information
| Project Identifiers | Project ID: 994602 DEA: 09392004 EFIS: 0922000036 |
|---|---|
| DIST-CO-RTE-PM | 09-INY-395-44.9/50.9,52.9/54.5 |
| Award Date | 04/27/2023 |
| Closeout Date | 12/22/2023 |
| Work Description | HOT MIX ASPHALT (TYPE-A), SHOULDER BACKING, AND STRIPING. |
| Location Description | INYO COUNTY NEAR LONE PINE FROM 1.3 MILES SOUTH OF COTTONWOOD ROAD TO 2 MILES NORTH OF BARTLETT ROAD AND FROM 0.3 MILE SOUTH OF LUBKEN CANYON ROAD TO 1.1 MILES SOUTH OF GOLF COURSE ROAD |
| QA Service Level | 1 (Verified on 08/02/2023) |
Sample Information
| Sample Taken Date | 07/19/2023 | Sample Unique Key | 7 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/20/2023 | Sample type | Department Acceptance |
| A brief description of the sample | 3/4" HMA Type A | The quantity of what the sample constitutes | 6 boxes |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Kristen |
| Last name of sampler or witnessed by | Cox | Title of sampler | QC |
| Telephone number of sampler | Laboratory sample identification | PSU 1 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Blue Diamond-Victorville | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-07-19-7
DIME Test ID: 2023-07-19-7-3
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2023-07-21
Test Results
Number of tests: 3
Is the sample lab compacted or field compacted?:
Input Type: Measured
Tester's full name: Derek Carrington
Date of test: 07/20/2023
| 1 | 2 | 3 | ||||
|---|---|---|---|---|---|---|
| 2.388 | 2.390 | 2.387 | ||||
| 2.484 | ||||||
3.9 % | 3.8 % | 3.9 % | ||||
3.9 % | ||||||
General comments (publicly viewable) (Max 1000 characters): PSU-01
Test was verified on 7/21/2023 ✔