Summary for Test 2023-07-05-6-1

Test performed: CTM 342-August 2012
Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only. Please click this link to view the corrected test.

Project Information

Project IdentifiersProject ID: 994244
DEA: 051F6204
EFIS: 0514000039
DIST-CO-RTE-PM05-SCR-152-1.9
Award Date11/29/2022
Closeout Date02/14/2024
Work DescriptionWIDEN BRIDGE, CONCRETE BARRIER, AND MODIFY ELECTRICAL SYSTEM.
Location DescriptionSANTA CRUZ COUNTY NEAR WATSONVILLE AT CORRALITOS CREEK BRIDGE
QA Service Level1 (Verified on 09/19/2022)

Sample Information

Sample Taken Date07/05/2023 Sample Unique Key6
Date that the sample was received by the laboratory/organization performing the testing07/05/2023 Sample typeDepartment Acceptance
A brief description of the sampleBRIDGE DECK The quantity of what the sample constitutesbridge
From where was the sample collectedJob Site First name of sampler or witnessed byHARISH
Last name of sampler or witnessed byThakur Title of sampler
Telephone number of sampler9152961873 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameJOB SITE
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypeNot set
Type of Traffic Control ProvidedNot set DIST-CO-RTENot set
Direction of TravelNot set Post MileNot set
Lanes to be TestedNot set StationNot set

Test Details

DIME Sample ID: 2023-07-05-6
DIME Test ID: 2023-07-05-6-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-07-18

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 07/16/2023
Air Temperature: 65
Tire Pressure: 24
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: NIGHT/WARM
Direction/Lane #: SB: Southbound Direction of Travel
Edge used to measure reference distance: BEGIN TRIAL SLAB
Edge used to measure position: EDGE OF SLAB
Reference Distance 1: 2
Reference Distance 2: 5
Reference Distance 3: 8
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 5
Position for Stationing 2: 5
Position for Stationing 3: 5
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.50
Corrected Coefficients of Friction for Stationing 2: 0.50
Corrected Coefficients of Friction for Stationing 3: 0.50
Average Coefficient of Friction: 0.50
General comments (publicly viewable) (Max 1000 characters): TRIAL SLAB ON BRIDGE

Test was verified on 7/18/2023 ✔

Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only.