Summary for Test 2023-07-12-33-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 214336
DEA: 07302404
EFIS: 0713000488
DIST-CO-RTE-PM07-VEN-101-37/40
Award Date11/17/2020
Closeout Date09/24/2024
Work DescriptionPADRE JUAN REHAB
Location DescriptionVEN 101
QA Service Level1 (Verified on 02/26/2021)

Sample Information

Sample Taken Date07/12/2023 Sample Unique Key33
Date that the sample was received by the laboratory/organization performing the testing07/12/2023 Sample typeQuality Assurance
A brief description of the sampleSubgrade Finish - Aggregate Base The quantity of what the sample constitutes1820 sqft
From where was the sample collectedJob Site First name of sampler or witnessed byManuel
Last name of sampler or witnessed byUy Title of sampler
Telephone number of sampler Laboratory sample identification23-1047
Linked DIME Sample ID The fabricator/manufacturer/facility namen/a
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)n/a
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedCTM 231 Test Holes
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/8 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2023-07-12-33
DIME Test ID: 2023-07-12-33-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-07-14

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Manuel Uy
Date of test: 07/12/2023
Gage No.: 30515
Test No.: 2
Nuclear By: Manuel Uy
Non-Bias Plan No.: 2
Depth: 5
Material No.: Subgrade Finish
Material Type: Aggregate Base
Impact By: Manuel Uy
Standard Count Density: 3042 g/cc
Count or Density 1: 5455 g/cc
Count or Density 2: 5729 g/cc
Count or Density 3: 5356 g/cc
Standard Count Moisture: 1076 g/cc
Moisture Count 1: 327 g/cc
Moisture Count 2: 312 g/cc
Moisture Count 3: 319 g/cc
Sum of Count or Density: 16540 g/cc
Average of Count or Density: 5513 g/cc
Sum of Moisture Count: 958 g/cc
Average of Moisture Count: 319 g/cc
Count Ratio Density: 1.81
Count Ratio Moisture: 0.3
Calculated Percent Relative Compaction: 97.2 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/14/2023 ✔