Summary for Test 2023-06-10-7-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 214451 DEA: 07303704 EFIS: 0714000035 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-101-8.0/27.3 |
| Award Date | 12/19/2019 |
| Closeout Date | 05/07/2024 |
| Work Description | REPLACE CONCRETE BARRIERS. |
| Location Description | THE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 08/12/2020) |
Sample Information
| Sample Taken Date | 06/10/2023 | Sample Unique Key | 7 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/10/2023 | Sample type | Quality Assurance |
| A brief description of the sample | Native - Subgrade | The quantity of what the sample constitutes | 3750 sqft |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Dominic |
| Last name of sampler or witnessed by | Montemayor | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 23-0827 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | n/a | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | CTM 231 Test Holes | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-06-10-7
DIME Test ID: 2023-06-10-7-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-07-05
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Dominic Montemayor
Date of test: 06/10/2023
Gage No.: 6946
Test No.: Retest
Nuclear By: Dominic Montemayor
Non-Bias Plan No.: 3
Depth: 5
Material No.: Subgrade
Material Type: Native
Impact By: Dominic Montemayor
Standard Count Density: 10050 g/cc
Count or Density 1: 15735 g/cc
Count or Density 2: 14856 g/cc
Count or Density 3: 13821 g/cc
Standard Count Moisture: 15617 g/cc
Moisture Count 1: 3445 g/cc
Moisture Count 2: 3143 g/cc
Moisture Count 3: 3110 g/cc
Sum of Count or Density: 44412 g/cc
Average of Count or Density: 14804 g/cc
Sum of Moisture Count: 9698 g/cc
Average of Moisture Count: 3233 g/cc
Count Ratio Density: 1.47
Count Ratio Moisture: 0.21
Calculated Percent Relative Compaction: 98.2 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/5/2023 ✔
