Summary for Test 2023-04-13-72-2

Test performed: ASTM C231-17a

Project Information

Project IdentifiersProject ID: 215129
DEA: 050N73U4
EFIS: 0520000166
DIST-CO-RTE-PM05-SB-101-7.3/9.6
Award Date10/22/2020
Closeout Date12/11/2023
Work Description!!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,
Location DescriptionSUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
QA Service Level1 (Verified on 08/24/2020)

Sample Information

Sample Taken Date04/13/2023 Sample Unique Key72
Date that the sample was received by the laboratory/organization performing the testing04/15/2023 Sample typeQuality Assurance
A brief description of the sampleCRCP PCC The quantity of what the sample constitutes355 CY
From where was the sample collectedSupplier First name of sampler or witnessed byDorell
Last name of sampler or witnessed byHarper Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameGranite Padaro Concrete Plant
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number231R
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected12111
Concrete batch plantGranite Padaro Plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedDischarge from concrete truck into wheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-04-13-72
DIME Test ID: 2023-04-13-72-2
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: ASTM C231-17a: Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2023-07-03

Test Results


Is wet sieving required?: No
Input Type: Measured
Tester's full name: Dorell Harper
Date of test: 04/13/2023
Time of test: no data
Apparent air content: 3.7 %
Aggregate correction factor: 0
Air content: 3.7 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/3/2023