Summary for Test 2023-05-23-85-1

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 215129
DEA: 050N73U4
EFIS: 0520000166
DIST-CO-RTE-PM05-SB-101-7.3/9.6
Award Date10/22/2020
Closeout Date12/11/2023
Work Description!!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,
Location DescriptionSUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
QA Service Level1 (Verified on 08/24/2020)

Sample Information

Sample Taken Date05/23/2023 Sample Unique Key85
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/24/2023
Sample typeDepartment Acceptance A brief description of the sampleConcrete Sample
The quantity of what the sample constitutes400 CY From where was the sample collectedSupplier
First name of sampler or witnessed byDorell Last name of sampler or witnessed byHarper
Title of sampler Telephone number of sampler6692889248
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGranites Portable Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number231R
The truck number from where the sample was collected1983 The batch plant ticket number from where the sample was collected12678
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedDischarge from concrete truck into wheelbarrow. Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-05-23-85
DIME Test ID: 2023-05-23-85-1
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2023-06-30

Test Results


Input Type: Calculated
Tester's full name: Dorell Harper
Date of test: 05/24/2023
Air Content: 2.9 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/30/2023