Summary for Test 2023-06-19-39-2

Test performed: ASTM D36-14ε1

Project Information

Project IdentifiersProject ID: 994936
DEA: 051P1604
EFIS: 0521000179
DIST-CO-RTE-PM05---
Award DateNot set
Closeout DateNot set
Work DescriptionNot set
Location DescriptionNot set
QA Service Level1 (Verified on 06/28/2023)

Sample Information

Sample Taken Date06/19/2023 Sample Unique Key39
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/29/2023
Sample typeQuality Assurance A brief description of the samplePSU, Asphalt Binder Sample
The quantity of what the sample constitutes1 can From where was the sample collectedSource
First name of sampler or witnessed byIssac Last name of sampler or witnessed byC
Title of samplerTET Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSierra Facific Transportation Laboratory (TL) Number023299
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAsphalt Rubber Binder Asphalt modifier supplierSan Joaquin Refining Co Inc
Performance GradePG 64-16 Lot number1
Sublot number1 Asphalt Rubber Binder Mix Number

Test Details

DIME Sample ID: 2023-06-19-39
DIME Test ID: 2023-06-19-39-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: ASTM D36-14ε1: Standard Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus) (Softening Point)
Test Release Date: 2023-06-29

Test Results


ASTM Thermometer used?: C
Input Type: Measured
Tester's full name: Karen Sawyer
Date of test: 06/28/2023
Softening Point Sample 1: 67 C
Softening Point Sample 2: 68 C
Bath Liquid: freshly boiled distilled water
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/29/2023