Summary for Test 2023-06-27-33-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 214670 DEA: 07331004 EFIS: 0716000220 |
|---|---|
| DIST-CO-RTE-PM | 07-VEN-101-9.0/9.2 |
| Award Date | 04/13/2022 |
| Closeout Date | 11/06/2024 |
| Work Description | CONCRETE SLAB REPLACEMENT & GRIND, PAVEMENT & RESURFACE ACE |
| Location Description | VENTURA COUNTY IN THOUSAND OAKS FROM NORTHBOUND OFF-RAMP TO SOUTHBOUND OFF-RAMP AT CONEJO COMMERCIAL VEHICLE ENFORCEMENT FACILITIES |
| QA Service Level | 1 (Verified on 07/12/2021) |
Sample Information
| Sample Taken Date | 06/27/2023 | Sample Unique Key | 33 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/27/2023 |
| Sample type | Department Acceptance | A brief description of the sample | Aggregate Base Class 2 |
| The quantity of what the sample constitutes | 1533 sq. yd | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Philip | Last name of sampler or witnessed by | Maquiran |
| Title of sampler | MREA | Telephone number of sampler | 12133581518 |
| Laboratory sample identification | 23-0919 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Powell | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | From various locations at AB Class 2 | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-06-27-33
DIME Test ID: 2023-06-27-33-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-06-28
Test Results
Method Type:: Direct Read
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Phillip Maquiran
Date of test: 06/27/2023
Sum of Count or Density: 10.58 g/cc
Average of Count or Density: 2.12 g/cc
Sum of Moisture Count: 0.64 g/cc
Average of Moisture Count: 0.13 g/cc
Calculated Percent Relative Compaction: 95.9 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/28/2023 ✔
