Summary for Test 2023-05-24-66-1

Test performed: CTM 523-May 2020

Project Information

Project IdentifiersProject ID: 208973
DEA: 120H1004
EFIS: 1200000180
COOP: 120670
DIST-CO-RTE-PM12-ORA-405,73,405,605-9.3/24.3
Award Date11/07/2016
Closeout DateNot set
Work Description(Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP.
Location DescriptionOrange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2
QA Service Level1 (Verified on 09/10/2015)

Sample Information

Sample Taken Date05/24/2023 Sample Unique Key66
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/24/2023
Sample typeQuality Assurance A brief description of the sample6x6x18 Beam
The quantity of what the sample constitutes3 From where was the sample collectedJob Site
First name of sampler or witnessed byJohnny Last name of sampler or witnessed byDo
Title of sampler Telephone number of sampler7143066148
Laboratory sample identification23-0174 Linked DIME Sample ID
The fabricator/manufacturer/facility nameRobertsons - Santa Ana Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberLB060008
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected1
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete from wheelbarrow Where the material sample would have been placed if not sampled73 Touchdown Center Median
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-05-24-66
DIME Test ID: 2023-05-24-66-1
Testing Lab: CT D12 - Huntington Beach Field Laboratory
Test Method: CTM 523-May 2020: Method of Test for Flexural Strength of Concrete
Test Release Date: 2023-06-21

Test Results


Number of specimens: 2
Unit system used?: US Units
Does the testing machine measure load or stress on the beam specimen?: Load
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Is a beam dimensional correction factor used?: No
Input Type: Calculated
Tester's full name: Dan Morris
Date of test: 06/21/2023
Identification number: 23-0174
Width of specimen: 6 inch
Width of specimen 2: 6 inch
Depth of specimen: 6.05 inch
Depth of specimen 2: 6.05 inch
Span length of specimen: 18 inch
Span length of specimen 2: 18 inch
Maximum load applied: 6550 lb
Maximum load applied 2: 7470 lb
Curing history and apparent moisture condition of the specimen: lime water bath
If specimen was capped, ground or if leather shims were used: 0
Defects in specimen: 0
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Modulus of rupture: 560 psi
Modulus of rupture 2: 640 psi
Modulus of rupture average: 600 psi
General comments (publicly viewable) (Max 1000 characters):

Test File Attachments

File NameExtensionFile SizeDate UploadedTest IDActions
23-0174pdf213.55 KB06/21/20232023-05-24-66-1   Info

Test was verified on 6/21/2023