Summary for Test 2023-06-05-3-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 994191
DEA: 081G8304
EFIS: 0816000079
DIST-CO-RTE-PM08-SBD-40-R100.8/R101.8
Award Date02/07/2023
Closeout Date08/29/2025
Work DescriptionHMA, STRUCTURAL CONC, BAR REINFORCING STEEL, CRSP & IMPORTED BORROW.
Location DescriptionSAN BERNARDINO COUNTY AT ESSEX FROM 1.1 MILES EAST OF ESSEX ROAD OVERCROSSING TO 0.5 MILE EAST OF HALFWAY HILLS WASH BRIDGE
QA Service Level1 (Verified on 03/30/2023)

Sample Information

Sample Taken Date06/05/2023 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testing06/06/2023 Sample typeQuality Assurance
A brief description of the sampleBearing Pad The quantity of what the sample constitutes25
From where was the sample collectedManufacturer First name of sampler or witnessed byBrad
Last name of sampler or witnessed byStreeter Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameScougal Rubber
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)23061-1
Material/Compound/Elastomer IDNA Samples Representing25
Description (size)3" x 9" x 9" Comments
Description (Number of Shims)6 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Scougal Rubber
Batch NumberNA

Test Details

DIME Sample ID: 2023-06-05-3
DIME Test ID: 2023-06-05-3-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2023-06-16

Test Results


Input Type: Calculated
Tester's full name: Mariano Pontillas
Date of test: 06/16/2023
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/16/2023 ✔