Summary for Test 2023-06-13-39-2
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 993424 DEA: 04281204 EFIS: 0400000769 |
|---|---|
| DIST-CO-RTE-PM | 04-NAP-29,221-5.5/6.7,0.0/0.2 |
| Award Date | 03/21/2022 |
| Closeout Date | Not set |
| Work Description | HMA, RDWY EXCAVATION, STRUCTURAL CONC AND MODIFYING LIGHTING SYSTEMS. |
| Location Description | NAPA COUNTY NEAR NAPA ON ROUTE 29 FROM 0.7 MILE SOUTH TO 0.5 MILE NORTH OF ROUTE 221 AND ON ROUTE 221 FROM 0.2 MILE NORTH OF ROUTE 29 TO ROUTE 29 |
| QA Service Level | 1 (Verified on 12/08/2021) |
Sample Information
| Sample Taken Date | 06/13/2023 | Sample Unique Key | 39 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/13/2023 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4" Class 2 AB |
| The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Nick | Last name of sampler or witnessed by | Hall |
| Title of sampler | QA Technician | Telephone number of sampler | 7072999133 |
| Laboratory sample identification | Con_23_686 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Job Site stock pile | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 21-0119 | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Job site stock pile | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-06-13-39
DIME Test ID: 2023-06-13-39-2
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2024-02-12
Test Results
Number of tests: 1
Input Type: Calculated
Tester's full name: KC Lafferty
Date of test: 06/13/2023
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 5.6
Sand reading (test 1): 3.3
Sand equivalent (test 1): 59
Sand equivalent before temperature correction: 0
Sand equivalent after temperature correction: 0
General comments (publicly viewable) (Max 1000 characters): SE = 59 passed
Test was verified on 2/12/2024 ✔
