Summary for Test 2023-06-14-30-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 993806 DEA: 07330504 EFIS: 0716000214 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-710-R15.1/21.9 |
| Award Date | 08/02/2022 |
| Closeout Date | 09/24/2024 |
| Work Description | INSTALL HIGHWAY PLANTING AND PLACE MINOR CONCRETE. |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE NORTH OF ROSECRANS AVENUE TO 0.1 MILE SOUTH OF ATLANTIC AVENUE UNDERCROSSING |
| QA Service Level | 1 (Verified on 05/11/2022) |
Sample Information
| Sample Taken Date | 06/14/2023 | Sample Unique Key | 30 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/30/2023 |
| Sample type | Department Acceptance | A brief description of the sample | Subgrade |
| The quantity of what the sample constitutes | 504 yd2 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Rosauro | Last name of sampler or witnessed by | Nogoy |
| Title of sampler | TEC | Telephone number of sampler | 2137939321 |
| Laboratory sample identification | 23-0841 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | Subgrade | A detailed description of where the material sample was collected | From various locations at subgrade. |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-06-14-30
DIME Test ID: 2023-06-14-30-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-06-14
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Rosauro Nogoy
Date of test: 06/14/2023
Gage No.: 60202
Test No.: no data
Nuclear By: Rosauro Nogoy
Non-Bias Plan No.: 2
Depth: 6 in
Material No.: On site
Material Type: Subgrade
Impact By: Rosauro Nogoy
Standard Count Density: 2319 g/cc
Count or Density 1: 2.19 g/cc
Count or Density 2: 2.17 g/cc
Count or Density 3: 2.22 g/cc
Standard Count Moisture: 631 g/cc
Moisture Count 1: 0.19 g/cc
Moisture Count 2: 0.22 g/cc
Moisture Count 3: 0.18 g/cc
Sum of Count or Density: 6.58 g/cc
Average of Count or Density: 2.19 g/cc
Sum of Moisture Count: 0.59 g/cc
Average of Moisture Count: 0.2 g/cc
Calculated Percent Relative Compaction: 97.9 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/14/2023 ✔
