Summary for Test 2023-04-18-36-3
Test performed: CTM 211-May 2010Project Information
Project Identifiers | Project ID: 66666 DEA: APP EFIS: 0019000052 |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for Aggregate Pre-approval Program (APP). Object Code: 1025. J2 DEA: 912680. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 04/18/2023 | Sample Unique Key | 36 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 05/01/2023 |
Sample type | Aggregate Prequalification Program | A brief description of the sample | 3/8” Rock |
The quantity of what the sample constitutes | 50 tons | From where was the sample collected | Source |
First name of sampler or witnessed by | Matt | Last name of sampler or witnessed by | Lincoln |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Chandler Aggregates Inc. | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0011 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Bunker pull from yard truck | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/8 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-04-18-36
DIME Test ID: 2023-04-18-36-3
Testing Lab: Chandler Aggregates, Incorporated
Test Method: CTM 211-May 2010: Abrasion of Coarse Aggregate by Use of the Los Angeles Abrasion Testing Machine
Test Release Date: 2023-06-06
Test Results
How many revolutions are required?: Both Tests
Input Type: Calculated
Tester's full name: Ryan Powney
Date of test: 05/01/2023
Grading: C
Percent wear (100 Rev Test): 4 %
Percent wear (500 Rev Test): 18 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/6/2023 ✔