Summary for Test 2023-05-22-67-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 993817
DEA: 051C4104
EFIS: 0512000139
DIST-CO-RTE-PM05-SB-154-R2.6/R2.6
Award Date01/18/2023
Closeout DateNot set
Work DescriptionALAMO PINTADO PED BRIDGE
Location DescriptionSANTA BARBARA COUNTY NEAR LOS OLIVOS AT ALAMO PINTADO CREEK PEDESTRIAN BRIDGE
QA Service Level1 (Verified on 05/23/2022)

Sample Information

Sample Taken Date05/22/2023 Sample Unique Key67
Date that the sample was received by the laboratory/organization performing the testing05/31/2023 Sample typeQuality Assurance
A brief description of the sampleBearing Pad The quantity of what the sample constitutes9
From where was the sample collectedManufacturer First name of sampler or witnessed byKrishnamoorthy
Last name of sampler or witnessed byPalaniappan Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameBridge Rubber Bearing
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)2527-8
Material/Compound/Elastomer IDNA Samples Representing9
Description (size)2.3" x 16" x 16" Comments
Description (Number of Shims)4 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Bridge Rubber Bearing
Batch Number133213

Test Details

DIME Sample ID: 2023-05-22-67
DIME Test ID: 2023-05-22-67-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2023-06-06

Test Results


Input Type: Measured
Tester's full name: Richard Wilmshurst
Date of test: 06/06/2023
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/6/2023 ✔