Summary for Test 2023-05-18-5-6
Test performed: CTM 523-May 2020Project Information
Project Identifiers | Project ID: 215180 DEA: 060Q9204 EFIS: 0614000010 COOP: 061764 |
---|---|
DIST-CO-RTE-PM | 06-KER-99-10.4/21.2 |
Award Date | 12/08/2020 |
Closeout Date | Not set |
Work Description | CONSTRUCT CRCP AND HMA (TYPE A) PAVEMENT. |
Location Description | KERN COUNTY IN AND NEAR BAKERSFIELD FROM 0.4 MILE SOUTH OF OLD US 99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING |
QA Service Level | 1 (Verified on 09/14/2020) |
Sample Information
Sample Taken Date | 05/18/2023 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/18/2023 |
Sample type | Department Acceptance | A brief description of the sample | CRCP -12 field curing and 4 standard curing beams set #2 |
The quantity of what the sample constitutes | 1030 CY load # 103 | From where was the sample collected | Source |
First name of sampler or witnessed by | James | Last name of sampler or witnessed by | Watson |
Title of sampler | Telephone number of sampler | 6615498281 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Hwy 223 off ramp sb 99 | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | G3-21-PCC-263 |
---|---|---|---|
The truck number from where the sample was collected | 12 | The batch plant ticket number from where the sample was collected | 103 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Back of Truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-05-18-5
DIME Test ID: 2023-05-18-5-6
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: CTM 523-May 2020: Method of Test for Flexural Strength of Concrete
Test Release Date: 2023-06-06
Test Results
Number of specimens: 3
Unit system used?: US Units
Does the testing machine measure load or stress on the beam specimen?: Load
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Is a beam dimensional correction factor used?: No
Input Type: Measured
Tester's full name: Kulwinder Rai
Date of test: 06/06/2023
Identification number: 31
Width of specimen: 5.95 inch
Width of specimen 2: 5.95 inch
Width of specimen 3: 5.95 inch
Depth of specimen: 6.05 inch
Depth of specimen 2: 6.1 inch
Depth of specimen 3: 6.15 inch
Span length of specimen: 18 inch
Span length of specimen 2: 18 inch
Span length of specimen 3: 18 inch
Maximum load applied: 7080 lb
Maximum load applied 2: 8210 lb
Maximum load applied 3: 7450 lb
Curing history and apparent moisture condition of the specimen: Good and Field Curing Beams
If specimen was capped, ground or if leather shims were used: Leather shims were used
Defects in specimen: 0
Age of specimen: 19 days
Age of specimen in hours: 0 hours
Modulus of rupture: 585 psi
Modulus of rupture 2: 665 psi
Modulus of rupture 3: 595 psi
Modulus of rupture average: 615 psi
General comments (publicly viewable) (Max 1000 characters): Field curing beam set # 31
Test File Attachments
File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
---|---|---|---|---|---|
06-0Q9204_37085_230517_19D_31 | 189.43 KB | 06/06/2023 | 2023-05-18-5-6 | Info |
Test was verified on 6/6/2023 ✔