Summary for Test 2022-03-08-38-3

Test performed: ASTM C143-20

Project Information

Project IdentifiersProject ID: 215188
DEA: 080F5434
EFIS: 0817000239
Permit Numbers: 0823NMC0369
DIST-CO-RTE-PM08-RIV-I-15,SR-91-6.1-7.6
Award Date03/11/2020
Closeout Date06/05/2024
Work DescriptionI-15 ELC: 15/91 Express Lanes Connector Project (ELC)
Location DescriptionJunction of I-15 and SR-91 in Corona, CA
QA Service Level1 (Verified on 09/16/2020)

Sample Information

Sample Taken Date03/08/2022 Sample Unique Key38
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing03/08/2022
Sample typeQuality Control A brief description of the sample1 cy in a wheelbarrow
The quantity of what the sample constitutes1 cy in a wheelbarrow From where was the sample collectedManufacturer
First name of sampler or witnessed byEdward Last name of sampler or witnessed byAllen
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCon-Fab California, LLC - Shafter Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberSCC-S98-0F
The truck number from where the sample was collected3 of 6 The batch plant ticket number from where the sample was collected2271
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedMiddle of 3rd Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2022-03-08-38
DIME Test ID: 2022-03-08-38-3
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2023-06-02

Test Results


Input Type: Calculated
Tester's full name: Roberto Reyes
Date of test: 03/08/2022
Slump: 26 inch
General comments (publicly viewable) (Max 1000 characters): Flow: 26" VSI: 0

Test was verified on 6/2/2023