Summary for Test 2023-05-18-1-8
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 212720 DEA: 07291404 EFIS: 0712000094 |
---|---|
DIST-CO-RTE-PM | 07-LA-1-55-58 |
Award Date | 02/18/2021 |
Closeout Date | Not set |
Work Description | TRANCAS CREEK BRIDGE REPLACEMENT |
Location Description | IN LOS ANGELES IN CITY OF MALIBU AT TRANCAS CREEK BRIDGE (53-0027). |
QA Service Level | 1 (Verified on 04/02/2021) |
Sample Information
Sample Taken Date | 05/18/2023 | Sample Unique Key | 1 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/24/2023 |
Sample type | Quality Assurance | A brief description of the sample | HRC 500 510 Couplers |
The quantity of what the sample constitutes | 216 pcs. | From where was the sample collected | Job Site |
First name of sampler or witnessed by | jacob | Last name of sampler or witnessed by | garcia |
Title of sampler | Telephone number of sampler | 3109128014 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | HRC | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L169-025-23 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | CMC Steel |
Coupler Manufacturer | HRC Fountian Valley | Intermediate Assembler or Fabricator | |
Rebar Size | #10 | Coupler Model | HRC 500 /510 |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | 74128926 | Rebar Heat Number(s) | 4124054, 3120181 |
Rebar Size 2 | Coupler Unique ID | TP-17-03 |
Test Details
DIME Sample ID: 2023-05-18-1
DIME Test ID: 2023-05-18-1-8
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2023-05-26
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: aauvinen
Date of test: 05/25/2023
UTM: 400kip
Temperature: 72.00 f
Halo ID:
Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|---|
1 | 4 | No. 10/32mm | 2 | 0 | 1.27 | 115890 | 91252 | Okay Necking | aauvinen |
General comments (publicly viewable) (Max 1000 characters): Okay Necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 5/26/2023 ✔