Summary for Test 2023-05-10-61-3
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 214337 DEA: 080E33U4 EFIS: 0817000075 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-115-R7.3/R10.0 |
| Award Date | 04/26/2021 |
| Closeout Date | 06/09/2025 |
| Work Description | ADD WB AUX & EB DECEL LANES, WIDEN I15 SW CONNECT,RAMPS/BRDG |
| Location Description | SAN BERNARDINO COUNTY IN ONTARIO FROM 0.2 MILE WEST OF CUCAMONGA CREEK BRIDGE TO MILLIKEN AVENUE |
| QA Service Level | 1 (Verified on 06/23/2021) |
Sample Information
| Sample Taken Date | 05/10/2023 | Sample Unique Key | 61 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/16/2023 |
| Sample type | Per Request | A brief description of the sample | PG Asphalt Binder |
| The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Plant | Last name of sampler or witnessed by | QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 0256-23 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | AAA-Corona | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-28 M |
|---|---|---|---|
| Modified | Yes | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2023-05-10-61
DIME Test ID: 2023-05-10-61-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2023-05-27
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sunday Agude
Date of test: 05/23/2023
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 167.273 grams
Mass of empty container #2: 169.569 grams
Mass of container #1 before test (m1i): 202.394 grams
Mass of container #2 before test (m2i): 204.642 grams
Mass of container #1 after test (m1f): 202.360 grams
Mass of container #2 after test (m2f): 204.613 grams
Average mass change: -0.090 percent
General comments (publicly viewable) (Max 1000 characters): -0.090 + 0.006 = 0.084
Test was verified on 5/27/2023 ✔
