Summary for Test 2023-04-13-59-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 212720
DEA: 07291404
EFIS: 0712000094
DIST-CO-RTE-PM07-LA-1-55-58
Award Date02/18/2021
Closeout Date04/23/2026
Work DescriptionTRANCAS CREEK BRIDGE REPLACEMENT
Location DescriptionIN LOS ANGELES IN CITY OF MALIBU AT TRANCAS CREEK BRIDGE (53-0027).
QA Service Level1 (Verified on 04/02/2021)

Sample Information

Sample Taken Date04/13/2023 Sample Unique Key59
Date that the sample was received by the laboratory/organization performing the testing05/08/2023 Sample typeQuality Assurance
A brief description of the sampleBearing Pad The quantity of what the sample constitutesNA
From where was the sample collectedManufacturer First name of sampler or witnessed byShanon
Last name of sampler or witnessed byTool Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameGRT Rubber
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)4-18-22
Material/Compound/Elastomer IDNA Samples RepresentingNA
Description (size).5" x 12" x 18" Commentstesting delayed due to document issues
Description (Number of Shims)0 Type of Bearing PadPlain
Description (Thickness of Shims)NA Manufacturer(s)GRT Rubber
Batch NumberNA

Test Details

DIME Sample ID: 2023-04-13-59
DIME Test ID: 2023-04-13-59-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2023-05-18

Test Results


Input Type: Measured
Tester's full name: Kirolos Kelada
Date of test: 05/18/2023
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/18/2023 ✔