Summary for Test 2023-05-15-5-7
Test performed: CTM 556-January 2018Project Information
| Project Identifiers | Project ID: 215396 DEA: 042K8404 EFIS: 0417000031 |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-29,80-0.0,0.8/1.6 |
| Award Date | 03/26/2021 |
| Closeout Date | 02/16/2024 |
| Work Description | HMA, STRUCTURAL CONCRETE, CIDH PILING AND REBAR. |
| Location Description | SOLANO COUNTY IN VALLEJO AT ROUTE 80/29 SEPARATION AND ON ROUTE 80 FROM 0.2 MILE NORTH OF CARQUINEZ BRIDGE TOLL PLAZA TO 0.3 MILE SOUTH OF MAGAZINE STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 01/25/2021) |
Sample Information
| Sample Taken Date | 05/15/2023 | Sample Unique Key | 5 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/16/2023 | Sample type | Quality Assurance |
| A brief description of the sample | Stage 3 Closure Pour | The quantity of what the sample constitutes | 18 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Angelo |
| Last name of sampler or witnessed by | Perez | Title of sampler | SR |
| Telephone number of sampler | 510-393-9319 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Central Martinez | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | 23-0259 | Structure name | Route 80/29 Separation |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | D101C5RS |
|---|---|---|---|
| The truck number from where the sample was collected | 6203 | The batch plant ticket number from where the sample was collected | 339865 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | concrete sample from wheelbarrow | Where the material sample would have been placed if not sampled | stage 3 closure pour L EOD |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-05-15-5
DIME Test ID: 2023-05-15-5-7
Testing Lab: CT D04 - Fairfield Construction Field Office 59-545
Test Method: CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement Concrete
Test Release Date: 2023-05-24
Test Results
Input Type: Measured
Tester's full name: Angelo Perez
Date of test: 05/15/2023
Slump: 4.25 inch
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/24/2023 ✔