Summary for Test 2023-04-25-81-3
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 994350 DEA: 070W1204 EFIS: 0721000060 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-2-24.4/46.0 |
| Award Date | 01/20/2023 |
| Closeout Date | 11/02/2023 |
| Work Description | SLURRY SEAL. |
| Location Description | LOS ANGELES COUNTY IN AND NEAR LA CANADA FLINTRIDGE AND PASADENA FROM ROUTE 2/210 SEPARATION TO 3.3 MILES EAST OF UPPER BIG TUJUNGA CANYON ROAD |
| QA Service Level | 1 (Verified on 07/24/2023) |
Sample Information
| Sample Taken Date | 04/25/2023 | Sample Unique Key | 81 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/27/2023 |
| Sample type | Per Request | A brief description of the sample | PG Asphalt Binder |
| The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Victor | Last name of sampler or witnessed by | Pham |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 0219-23 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | AAA-Irwindale | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2023-04-25-81
DIME Test ID: 2023-04-25-81-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2023-05-12
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Majid Essa
Date of test: 05/10/2023
Any material loss from containers during heating process/testing?: Yes
Mass of empty container #1: 172.721 grams
Mass of empty container #2: 176.519 grams
Mass of container #1 before test (m1i): 207.897 grams
Mass of container #2 before test (m2i): 211.755 grams
Mass of container #1 after test (m1f): 207.805 grams
Mass of container #2 after test (m2f): 211.646 grams
Average mass change: -0.285 percent
General comments (publicly viewable) (Max 1000 characters): Corrected = -0.279
Test was verified on 5/12/2023 ✔
