Summary for Test 2023-04-26-80-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 214649 DEA: 07316004 EFIS: 0715000194 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-14-60.70 |
| Award Date | 02/07/2023 |
| Closeout Date | Not set |
| Work Description | REHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES. |
| Location Description | ROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE. |
| QA Service Level | 1 (Verified on 01/29/2020) |
Sample Information
| Sample Taken Date | 04/26/2023 | Sample Unique Key | 80 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/05/2023 | Sample type | Verification |
| A brief description of the sample | PG Asphalt Binder | The quantity of what the sample constitutes | 1 Quart Can |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Thomas |
| Last name of sampler or witnessed by | Shivers | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 0238-23 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan-Palmdale | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 70-10 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2023-04-26-80
DIME Test ID: 2023-04-26-80-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2023-05-11
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sunday Agude
Date of test: 05/09/2023
Any material loss from containers during heating process/testing?: no data
Mass of empty container #1: 167.271 grams
Mass of empty container #2: 169.567 grams
Mass of container #1 before test (m1i): 202.555 grams
Mass of container #2 before test (m2i): 204.883 grams
Mass of container #1 after test (m1f): 202.493 grams
Mass of container #2 after test (m2f): 204.825 grams
Average mass change: -0.170 percent
General comments (publicly viewable) (Max 1000 characters): -0.170 + 0.006 = -0.163
Test was verified on 5/11/2023 ✔
