Summary for Test 2023-01-26-104-4

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 993446
DEA: 120J34U4
EFIS: 1218000034
DIST-CO-RTE-PM12-ORA-55,55-29.6,R6.4/10.3
Award Date05/27/2022
Closeout DateNot set
Work DescriptionCONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS.
Location DescriptionORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION
QA Service Level1 (Verified on 06/24/2022)

Sample Information

Sample Taken Date01/26/2023 Sample Unique Key104
Date that the sample was received by the laboratory/organization performing the testing01/27/2023 Sample typeQuality Control
A brief description of the sample6x12 cylinders The quantity of what the sample constitutes2
From where was the sample collectedJob Site First name of sampler or witnessed byGabriel
Last name of sampler or witnessed byRamirez Title of samplerQC Field Technician
Telephone number of sampler Laboratory sample identificationSet 1
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility namejob site
Transportation Laboratory (TL) NumberUnknown Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifier00-0000 Structure nameRW Footing
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberS85C440T18
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collected0
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedRW Footing STA 12-88 Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Test Details

DIME Sample ID: 2023-01-26-104
DIME Test ID: 2023-01-26-104-4
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2023-05-09

Test Results


Input Type: Calculated
Tester's full name: Gabriel Ramirez
Date of test: 01/26/2023
Air Content: 1.7 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/9/2023 ✔