Summary for Test 2023-04-27-60-2

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 215129
DEA: 050N73U4
EFIS: 0520000166
DIST-CO-RTE-PM05-SB-101-7.3/9.6
Award Date10/22/2020
Closeout Date12/11/2023
Work Description!!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,
Location DescriptionSUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
QA Service Level1 (Verified on 08/24/2020)

Sample Information

Sample Taken Date04/27/2023 Sample Unique Key60
Date that the sample was received by the laboratory/organization performing the testing04/27/2023 Sample typeQuality Control
A brief description of the sample1x4 concrete aggs The quantity of what the sample constitutes1 per batch
From where was the sample collectedFabricator First name of sampler or witnessed byJustin
Last name of sampler or witnessed byGonzalez Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameMartin Marietta
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-42-0003
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedbelt cut
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2023-04-27-60
DIME Test ID: 2023-04-27-60-2
Testing Lab: Sequoia Consultants
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2023-05-08

Test Results


Number of tests: 2
Input Type: Calculated
Tester's full name: Justin Gonzalez
Date of test: 04/28/2023
Temperature correction: 0
Temperature of solution: 77
Clay reading (test 1): 4.1
Sand reading (test 1): 3.3
Clay reading (test 2): 4.1
Sand reading (test 2): 3.1
Sand equivalent (test 1): 81
Sand equivalent (test 2): 76
Sand equivalent before temperature correction: 79
Sand equivalent after temperature correction: 79
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/8/2023