Summary for Test 2023-04-17-1-2
Test performed: AASHTO T308-10
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Please click this
link
to view the corrected test.
Project Information
| Project Identifiers | Project ID: 99999 DEA: 0322222 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| QA Service Level | (Verified on 04/05/2013) |
Sample Information
| Sample Taken Date | 04/17/2023 | Sample Unique Key | 1 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/18/2023 |
| Sample type | Department Acceptance | A brief description of the sample | 1/2" HMA-A 25% RAP |
| The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Leif | Last name of sampler or witnessed by | Ayres |
| Title of sampler | Telephone number of sampler | 7074960974 | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Granite Ukiah | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | 3922 | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-04-17-1
DIME Test ID: 2023-04-17-1-2
Testing Lab: CT HQ - Sacramento Materials Management Branch Field Office
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-05-02
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Alexis Corona
Date of test: 04/21/2023
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 4.1 g
Mass Loss: 3.1 g
Correction Factor (Percent by mass of HMA Specimen): 6.88 %
Moisture Content: 8.66 %
Temperature Compensation Factor: 7.99 %
Test Temperature: 7.45 F
Corrected Asphalt Binder Content: 2.67 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/2/2023 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
