Summary for Test 2023-04-18-78-2
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 214451 DEA: 07303704 EFIS: 0714000035 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-101-8.0/27.3 |
| Award Date | 12/19/2019 |
| Closeout Date | 05/07/2024 |
| Work Description | REPLACE CONCRETE BARRIERS. |
| Location Description | THE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 08/12/2020) |
Sample Information
| Sample Taken Date | 04/18/2023 | Sample Unique Key | 78 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/20/2023 |
| Sample type | Per Request | A brief description of the sample | PG Asphalt Binder |
| The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Gerardo | Last name of sampler or witnessed by | Zubieta |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 0211-23 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | AAA-Irwindale | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2023-04-18-78
DIME Test ID: 2023-04-18-78-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2023-04-30
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sm Ali
Date of test: 04/27/2023
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 167.271 grams
Mass of empty container #2: 169.568 grams
Mass of container #1 before test (m1i): 202.418 grams
Mass of container #2 before test (m2i): 204.362 grams
Mass of container #1 after test (m1f): 202.369 grams
Mass of container #2 after test (m2f): 204.313 grams
Average mass change: -0.140 percent
General comments (publicly viewable) (Max 1000 characters): - 0.140 + 0.006 = - 0.134
Test was verified on 4/30/2023 ✔
