Summary for Test 2023-03-07-50-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 994093
DEA: 07342804
EFIS: 0717000331
DIST-CO-RTE-PM07-LA-14-R27.0/R28.1
Award Date09/21/2022
Closeout Date09/24/2024
Work DescriptionCONSTRUCT CATCHMENT WALL, ROCK SCALING AND CONCRETE BARRIER.
Location DescriptionLOS ANGELES COUNTY IN SANTA CLARITA FROM THE NEWHALL AVENUE UNDERCROSSING TO 0.1 MILE SOUTH OF PLACERITA CANYON ROAD UNDERCROSSING
QA Service Level1 (Verified on 09/20/2022)

Sample Information

Sample Taken Date03/07/2023 Sample Unique Key50
Date that the sample was received by the laboratory/organization performing the testing03/30/2023 Sample typeQuality Assurance
A brief description of the sampleBearing Pad The quantity of what the sample constitutes50
From where was the sample collectedManufacturer First name of sampler or witnessed byDavid
Last name of sampler or witnessed bySimon Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameD.S. Brown
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)1065394-1102-2A-6
Material/Compound/Elastomer IDNA Samples Representing50
Description (size)48"x6"x.5" Comments
Description (Number of Shims)0 Type of Bearing PadPlain
Description (Thickness of Shims)NA Manufacturer(s)DS Brown
Batch NumberNA

Test Details

DIME Sample ID: 2023-03-07-50
DIME Test ID: 2023-03-07-50-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2023-04-20

Test Results


Input Type: Measured
Tester's full name: Richard Wilmshurst
Date of test: 04/20/2023
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/20/2023 ✔