Summary for Test 2022-10-27-73-5

Test performed: CTM 556-January 2018

Project Information

Project IdentifiersProject ID: 993446
DEA: 120J34U4
EFIS: 1218000034
DIST-CO-RTE-PM12-ORA-55,55-29.6,R6.4/10.3
Award Date05/27/2022
Closeout DateNot set
Work DescriptionCONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS.
Location DescriptionORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION
QA Service Level1 (Verified on 06/24/2022)

Sample Information

Sample Taken Date10/27/2022 Sample Unique Key73
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/29/2022
Sample typeQuality Control A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes3 From where was the sample collectedJob Site
First name of sampler or witnessed byRonald Last name of sampler or witnessed byHernandez
Title of samplerQC Field Technician Telephone number of sampler
Laboratory sample identificationSet 1 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameJob site Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifier00-0000
Structure nameRetaining Wall 386 Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberS85C440T18
The truck number from where the sample was collectedLOAD 1 The batch plant ticket number from where the sample was collected0
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedSTA 21-44 to 21-29 Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Test Details

DIME Sample ID: 2022-10-27-73
DIME Test ID: 2022-10-27-73-5
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement Concrete
Test Release Date: 2023-04-20

Test Results


Input Type: Calculated
Tester's full name: Ronald Hernandez
Date of test: 10/27/2022
Slump: 4.25 inch
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/20/2023