Summary for Test 2023-04-13-30-2
Test performed: CTM 227-December 2014Project Information
| Project Identifiers | Project ID: 212896 DEA: 04160304 EFIS: 0400000429 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-84-13.1/13.5 |
| Award Date | 11/17/2020 |
| Closeout Date | Not set |
| Work Description | NILES CANYON ALAMEDA CREEK BRIDGE REPLACEMENT |
| Location Description | IN FREMONT, AT ALAMEDA CREEK BRIDGE (BR 33-0036). |
| QA Service Level | 1 (Verified on 09/16/2019) |
Sample Information
| Sample Taken Date | 04/13/2023 | Sample Unique Key | 30 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/14/2023 |
| Sample type | Quality Control | A brief description of the sample | 1 x 4 Aggregate |
| The quantity of what the sample constitutes | 1 Day | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Dylan | Last name of sampler or witnessed by | Bishop |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Central Ready Mix | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-35-0012 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Stockpile | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-04-13-30
DIME Test ID: 2023-04-13-30-2
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 227-December 2014: Method of Test for Evaluating Cleanness of Coarse Aggregate (Cleanness)
Test Release Date: 2023-04-18
Test Results
Describe the gradation of the aggregate or the test method:: All aggregate is the same size
Input Type: Calculated
Tester's full name: Todd Strait
Date of test: 04/14/2023
Cleanness value (single primary size): 66
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/18/2023 ✔
