Summary for Test 2023-04-14-12-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993816 DEA: 07326804 EFIS: 0716000119 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-210-R9.7/R51.9 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Design and construct the State Route 210 ADA Curb Ramp Upgrades Project through a design-build contract. |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 05/17/2022) |
Sample Information
| Sample Taken Date | 04/14/2023 | Sample Unique Key | 12 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/17/2023 |
| Sample type | Department Acceptance | A brief description of the sample | 3/4" HMA-A 300154 |
| The quantity of what the sample constitutes | 20 tons | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Victor | Last name of sampler or witnessed by | Pham |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | 23-054 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Blue Diamond Material-Irwindale | Transportation Laboratory (TL) Number | 0414A2 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 300154 | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-04-14-12
DIME Test ID: 2023-04-14-12-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-04-17
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Daniel Gomez
Date of test: 04/17/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 4010.9 g
Mass of the specimen and specimen basket assembly prior to ignition: 6064.9 g
Mass of HMA Sample prior to ignition: 2054.0 g
Mass Loss: 111.9 g
Mass of aggregate remaining after ignition: 1942.1 g
Correction Factor (Percent by mass of HMA Specimen): 0.15 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.30 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/17/2023 ✔
