Summary for Test 2023-04-12-2-2

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 214640
DEA: 042J7204
EFIS: 0415000016
DIST-CO-RTE-PM04-CC-580-1.17
Award Date02/25/2021
Closeout Date12/01/2023
Work DescriptionSTEGE DRAIN SUPER-STRUCTURE, PRECAST VOIDED SLABS
Location DescriptionCONTRA COSTA COUNTY IN RICHMOND FROM 0.3 MILE EAST OF STEGE DRAIN BRIDGE TO 0.3 MILE WEST OF BAYVIEW AVENUE OVERCROSSING
QA Service Level1 (Verified on 01/27/2020)

Sample Information

Sample Taken Date04/12/2023 Sample Unique Key2
Date that the sample was received by the laboratory/organization performing the testing04/13/2023 Sample typeDepartment Acceptance
A brief description of the samplefriction testing The quantity of what the sample constitutesbridge
From where was the sample collectedJob Site First name of sampler or witnessed byHARISH
Last name of sampler or witnessed byThakur Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility name580
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypeNot set
Type of Traffic Control ProvidedNot set DIST-CO-RTENot set
Direction of TravelNot set Post MileNot set
Lanes to be TestedNot set StationNot set

Test Details

DIME Sample ID: 2023-04-12-2
DIME Test ID: 2023-04-12-2-2
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-04-14

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 04/13/2023
Air Temperature: 49
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: NIGHT/WARM
Direction/Lane #: WB: Westbound Direction of Travel
Edge used to measure reference distance: BEGIN BRIDGE
Edge used to measure position: RIGHT OF WALL
Reference Distance 1: 13
Reference Distance 2: 16
Reference Distance 3: 19
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 21
Position for Stationing 2: 21
Position for Stationing 3: 21
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.44
Corrected Coefficients of Friction for Stationing 2: 0.44
Corrected Coefficients of Friction for Stationing 3: 0.42
Average Coefficient of Friction: 0.43
General comments (publicly viewable) (Max 1000 characters): BRIDGE

Test was verified on 4/14/2023 ✔