Summary for Test 2023-04-14-3-3

Test performed: CHEMLP 11-16

Project Information

Project IdentifiersProject ID: 99999
DEA: 0322222
DIST-CO-RTE-PM03-SAC,OMG-888,99,80-0.6-0.6
Award DateNot set
Closeout DateNot set
Work DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
Location DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
QA Service Level (Verified on 04/05/2013)

Sample Information

Sample Taken Date04/14/2023 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testing04/14/2023 Sample typeQuality Assurance
A brief description of the sample0 The quantity of what the sample constitutes0
From where was the sample collectedSource First name of sampler or witnessed by00
Last name of sampler or witnessed by0 Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameTeichert
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypePaint Batch Number
Color Batch sizeNot set
Date of ManufacturingNot set Paint SpecificationNot set
Paint Specification VersionNot set Paint Specification if not listedNot set

Test Details

DIME Sample ID: 2023-04-14-3
DIME Test ID: 2023-04-14-3-3
Testing Lab: CT HQ - Sacramento Materials Management Branch Field Office
Test Method: CHEMLP 11-16: Accelerated Package Stability
Test Release Date: 2023-04-14

Test Results


Input Type: Measured
Tester's full name: Michael Maksimovich
Date of test: 04/13/2023
Consistency: 0 Krebs
Accelerated Package Stability: no data
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/14/2023 ✔