Summary for Test 2023-04-07-14-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 993141 DEA: 060V1204 EFIS: 0616000207 |
|---|---|
| DIST-CO-RTE-PM | 06-MAD-99-R6.9/R7.6 |
| Award Date | 06/22/2022 |
| Closeout Date | 12/02/2025 |
| Work Description | Cottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS. |
| Location Description | MADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING |
| QA Service Level | 1 (Verified on 07/28/2021) |
Sample Information
| Sample Taken Date | 04/07/2023 | Sample Unique Key | 14 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/07/2023 |
| Sample type | Quality Assurance | A brief description of the sample | Drainage backfill |
| The quantity of what the sample constitutes | 1000 SQYD | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Noah | Last name of sampler or witnessed by | Hunt |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Unknown | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Drainage System 13 | |
| Where the material sample would have been placed if not sampled | Pipe Backfill |
Test Details
DIME Sample ID: 2023-04-07-14
DIME Test ID: 2023-04-07-14-1
Testing Lab: CT D06 - Millbrook Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-04-11
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Allen Oliver
Date of test: 04/07/2023
Sum of Count or Density: 2860 g/cc
Average of Count or Density: 953 g/cc
Sum of Moisture Count: 499 g/cc
Average of Moisture Count: 166 g/cc
Count Ratio Density: 0.48
Count Ratio Moisture: 0.27
Calculated Percent Relative Compaction: 99.1 %
Reported Percent Relative Compaction: 99 %
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| IMG_0386 | JPG | 4758.91 KB | 04/11/2023 | 2023-04-07-14-1 | Info |
Test was verified on 4/11/2023 ✔
