Summary for Test 2023-04-10-7-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 993482 DEA: 060V2804 EFIS: 0616000124 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-184-L0.9/L1.1 |
| Award Date | 02/24/2022 |
| Closeout Date | 02/26/2024 |
| Work Description | PLACE HMA AND MINOR CONCRETE, REPLACE ELECTRICAL & LIGHTING SYSTEMS. |
| Location Description | KERN COUNTY NEAR LAMONT FROM 0.1 MILE SOUTH TO 0.1 MILE NORTH OF SUNSET BOULEVARD |
| QA Service Level | 1 (Verified on 01/03/2022) |
Sample Information
| Sample Taken Date | 04/10/2023 | Sample Unique Key | 7 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/10/2023 | Sample type | Department Acceptance |
| A brief description of the sample | Native Soil- sitty FM sand mod. clay and gravel | The quantity of what the sample constitutes | 40 lbs |
| Sample size | Not set | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | James | Last name of sampler or witnessed by | Watson |
| Title of sampler | Tester | Telephone number of sampler | 6615498281 |
| Laboratory sample identification | 34 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Sta 17+85 to 18+75 S line | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Test holes at jobsite | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-04-10-7
DIME Test ID: 2023-04-10-7-1
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-04-10
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: James Watson
Date of test: 04/10/2023
Gage No.: 30699
Test No.: 34
Nuclear By: James Watson
Non-Bias Plan No.: 1 - odd
Depth: 8
Material No.: no data
Material Type: Brown- sandy silt, some clay and gravel
Impact By: James Watson
Standard Count Density: 1947
Count or Density 1: 914
Count or Density 2: 975
Count or Density 3: 923
Standard Count Moisture: 627
Moisture Count 1: 139
Moisture Count 2: 145
Moisture Count 3: 146
Sum of Count or Density: 2812
Average of Count or Density: 937
Sum of Moisture Count: 430
Average of Moisture Count: 143
Count Ratio Density: 0.48
Count Ratio Moisture: 0.23
Calculated Percent Relative Compaction: 97.7 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters): Center of Rt 184 and Sunset Roundabout Sta 17+85 to 18+75 Sline elevation: FSG width = 90 ft probe: 8" 90%
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 06-0V2804_37016_230410_34 | 119.27 KB | 04/10/2023 | 2023-04-10-7-1 | Info |
Test was verified on 4/10/2023 ✔
