Summary for Test 2023-04-05-13-3
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 215425 DEA: 06360244 EFIS: 0613000005 |
---|---|
DIST-CO-RTE-PM | 06-TUL-99-30.6/35.2 |
Award Date | 04/23/2021 |
Closeout Date | Not set |
Work Description | Widen Freeway & Bridge Construction (Concrete Bridge) |
Location Description | Not set |
QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
Sample Taken Date | 04/05/2023 | Sample Unique Key | 13 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/05/2023 |
Sample type | Quality Assurance | A brief description of the sample | 1x4 Aggregates |
The quantity of what the sample constitutes | 100 Tons | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Doug | Last name of sampler or witnessed by | Ruff |
Title of sampler | Consultant Tester | Telephone number of sampler | 5594670032 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CalPort Tul Plant | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | 99 NB Packwood Crk JPCP |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Unknown |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Conveyor Belt | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
The concrete mix design number | 72444N0M | Lot number | |
Sublot number | Aggregate Mix Number | 72444N0M |
Test Details
DIME Sample ID: 2023-04-05-13
DIME Test ID: 2023-04-05-13-3
Testing Lab: CT D06 - Visalia Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2023-04-05
Test Results
Number of tests: 1
Input Type: Calculated
Tester's full name: Doug Ruff
Date of test: 04/05/2023
Temperature correction: 0
Temperature of solution: 77
Clay reading (test 1): 5.2
Sand reading (test 1): 4.3
Sand equivalent (test 1): 83
Sand equivalent before temperature correction: 0
Sand equivalent after temperature correction: 83
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/5/2023 ✔