Summary for Test 2023-03-05-5-3
Test performed: CTM 521-June 2020Project Information
Project Identifiers | Project ID: 215753 DEA: 050N72U4 EFIS: 0520000169 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-4.4/R7.7 |
Award Date | 03/01/2021 |
Closeout Date | Not set |
Work Description | Please cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B. |
Location Description | 101 freeway in Summerland, CA |
QA Service Level | 1 (Verified on 05/06/2021) |
Sample Information
Sample Taken Date | 03/05/2023 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/15/2023 |
Sample type | Preliminary | A brief description of the sample | 4x8 concrete cylinders |
The quantity of what the sample constitutes | 200 cy | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Jesse | Last name of sampler or witnessed by | Gomez |
Title of sampler | Telephone number of sampler | 8055501704 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Granites Portable Plant | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 231R |
---|---|---|---|
The truck number from where the sample was collected | 1983 | The batch plant ticket number from where the sample was collected | 12083 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Discharge from concrete truck into wheelbarrow. | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-03-05-5
DIME Test ID: 2023-03-05-5-3
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2023-04-03
Test Results
Unit system used?: US Units
Number of specimens: 3
Test performed: With no density determined
Input Type: Measured
Tester's full name: Tom Cromwell
Date of test: 04/03/2023
Capped in accordance with?: ASTM C1231 - Unbonded Elastomeric Pad Cap
Average diameter of cylinder 1: 4.01 in
Average diameter of cylinder 2: 4.02 in
Average diameter of cylinder 3: 4.02 in
Maximum load on cylinder 1: 67640 lb
Maximum load on cylinder 2: 69190 lb
Maximum load on cylinder 3: 68450 lb
Type of fracture pattern of cylinder 1: 3
Type of fracture pattern of cylinder 2: 2
Type of fracture pattern of cylinder 3: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Correction factor for cylinder 2: 1
Correction factor for cylinder 3: 1
Age of specimen: 28.5 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 12.63 in^2
Cross sectional area of cylinder 2: 12.69 in^2
Cross sectional area of cylinder 3: 12.69 in^2
Compressive strength of cylinder 1: 5355.5 psi
Compressive strength of cylinder 2: 5452.3 psi
Compressive strength of cylinder 3: 5394 psi
Compressive strength (to nearest 10 psi): 5400 psi
General comments (publicly viewable) (Max 1000 characters): Correlation Cylinder for CPCR spec change
Test was verified on 4/3/2023 ✔