Summary for Test 2023-03-28-9-2

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 215753
DEA: 050N72U4
EFIS: 0520000169
DIST-CO-RTE-PM05-SB-101-4.4/R7.7
Award Date03/01/2021
Closeout DateNot set
Work DescriptionPlease cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B.
Location Description101 freeway in Summerland, CA
QA Service Level1 (Verified on 05/06/2021)

Sample Information

Sample Taken Date03/28/2023 Sample Unique Key9
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/28/2023
Sample typeDepartment Acceptance A brief description of the sampleClass 2 Aggregate Base
The quantity of what the sample constitutes875 Cubic Feet From where was the sample collectedJob Site
First name of sampler or witnessed byDarren Last name of sampler or witnessed byHarper
Title of sampler Telephone number of sampler6692889248
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameOnsite Pulverized Asphalt Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)na
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedMat
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2023-03-28-9
DIME Test ID: 2023-03-28-9-2
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2023-03-30

Test Results


Number of tests: 1
Input Type: Measured
Tester's full name: Tom Cromwell
Date of test: 03/30/2023
Temperature correction: 0
Temperature of solution: 73
Clay reading (test 1): 6.3
Sand reading (test 1): 3.6
Sand equivalent (test 1): 58
Sand equivalent before temperature correction: 58
Sand equivalent after temperature correction: 58
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/30/2023