Summary for Test 2023-03-17-4-2

Test performed: ASTM A775-19

Project Information

Project IdentifiersProject ID: 993580
DEA: 020H5704
EFIS: 0215000052
DIST-CO-RTE-PM02-MOD-139-R3.5/30.3
Award Date11/10/2022
Closeout Date05/06/2024
Work DescriptionMODOC 139 DRAINAGE - DRAINAGE REHABILITATION
Location DescriptionIN MODOC COUNTY AT VARIOUS LOCATIONS FROM 1.2 MILES NORTH OF HOWARDS GULCH BRIDGE TO 0.1 MILE SOUTH OF CLEAR LAKE ROAD.
QA Service Level1 (Verified on 03/02/2022)

Sample Information

Sample Taken Date03/17/2023 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/20/2023
Sample typeQuality Assurance A brief description of the sample2 - 30" #5 bars
The quantity of what the sample constitutes4688 lbs From where was the sample collectedOther
First name of sampler or witnessed bySteve Last name of sampler or witnessed byHaynes
Title of samplerQA Inspector Telephone number of sampler510-593-1179
Laboratory sample identification Linked DIME Sample ID2023-03-17-2, 2023-03-17-3
The fabricator/manufacturer/facility namePrecast Unlimited Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) FormS81-021-23 Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM7 - Epoxy Coated Rebar Rebar Heat Number(s)479222
Rebar Epoxy Batch Number(s)CH2142AP Rebar Coating SpecificationASTM A775
Rebar Size (#)5 Rebar Coating ColorGreen
Rebar ManufacturerCascade Steel Oregon Rebar CoaterWestern Coating Auburn WA
Rebar Powder ManufacturerSherwin Williams Release Number4738
Quality Assurance CodeCQC6

Test Details

DIME Sample ID: 2023-03-17-4
DIME Test ID: 2023-03-17-4-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: ASTM A775-19: Standard Specification for Epoxy-Coated Steel Reinforcing Bars (Holiday)
Test Release Date: 2023-03-23

Test Results


Input Type: Measured
Tester's full name: Steven Paine
Date of test: 03/23/2023
Total Number of Holiday: 0
Total Length: 5
Holidays Per Linear Foot of Bar: 0
Holiday Test Pass/Fail: Pass
Bend Test Pass/Fail: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/23/2023