Summary for Test 2023-01-27-45-2
Test performed: CTM 504-June 2010Project Information
Project Identifiers | Project ID: 993183 DEA: 031H2704 EFIS: 0316000082 |
---|---|
DIST-CO-RTE-PM | 03-YUB-70-R11.2/13.5 |
Award Date | 10/14/2021 |
Closeout Date | Not set |
Work Description | UPGRADE BRIDGE RAILS & CONSTRUCT CONCRETE MEDIAN BARRIER. |
Location Description | YUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 2.4 MILES SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD |
QA Service Level | 1 (Verified on 08/16/2021) |
Sample Information
Sample Taken Date | 01/27/2023 | Sample Unique Key | 45 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/27/2023 |
Sample type | Quality Control | A brief description of the sample | Concrete |
The quantity of what the sample constitutes | 100 Cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Dylan | Last name of sampler or witnessed by | Bishop |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Cemex | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 1442005 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | set 1 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Beale rd overpass paving notch | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-01-27-45
DIME Test ID: 2023-01-27-45-2
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2023-03-17
Test Results
Input Type: Calculated
Tester's full name: Dylan Bishop
Date of test: 01/27/2023
Air Content: 2.2 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/17/2023 ✔