Summary for Test 2023-02-15-53-1
Test performed: ASTM C1064-17Project Information
Project Identifiers | Project ID: 994087 DEA: 051G4104 EFIS: 0515000012 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-4.0/4.8 |
Award Date | 09/02/2022 |
Closeout Date | 08/12/2024 |
Work Description | Santa Claus Lane Bike Path - !!Charge time to 05-0N72U4 per Project Manager / Corridor Manager!! |
Location Description | !!Charge time to 05-0N72U4 per Project Manager / Corridor Manager!! |
QA Service Level | 1 (Verified on 07/25/2022) |
Sample Information
Sample Taken Date | 02/15/2023 | Sample Unique Key | 53 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/15/2023 |
Sample type | Department Acceptance | A brief description of the sample | Concrete Sample |
The quantity of what the sample constitutes | 8 CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Tom | Last name of sampler or witnessed by | Cromwell |
Title of sampler | Telephone number of sampler | 8056991626 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Martin Marietta Goleta | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 725A1Z0P |
---|---|---|---|
The truck number from where the sample was collected | 544 | The batch plant ticket number from where the sample was collected | 3432937 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Discharge from concrete truck into wheelbarrow. | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-02-15-53
DIME Test ID: 2023-02-15-53-1
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: ASTM C1064-17: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Test Release Date: 2023-03-16
Test Results
Input Type: Calculated
Tester's full name: Tom Cromwell
Date of test: 02/15/2023
Temperature: 62 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/16/2023 ✔