Summary for Test 2023-03-08-32-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 214524 DEA: 07304504 EFIS: 0714000067 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-57-R0.0/R4.5 |
| Award Date | 06/11/2020 |
| Closeout Date | 04/03/2025 |
| Work Description | CONCRETE PAVEMENT, CONCRETE BARRIER, AND ELECTRICAL WORK. |
| Location Description | LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION |
| QA Service Level | 1 (Verified on 08/12/2020) |
Sample Information
| Sample Taken Date | 03/08/2023 | Sample Unique Key | 32 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/08/2023 |
| Sample type | Quality Assurance | A brief description of the sample | Aggregate Base |
| The quantity of what the sample constitutes | 15320 square feet | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Manuel | Last name of sampler or witnessed by | Uy |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 23-0235 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | n/a | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | n/a |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | CTM 231 Test Holes | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-03-08-32
DIME Test ID: 2023-03-08-32-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-03-10
Test Results
Method Type:: Direct Read
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Manuel Uy
Date of test: 03/08/2023
Gage No.: 30515
Test No.: 237R1
Nuclear By: Manuel Uy
Non-Bias Plan No.: 2
Depth: 3
Material No.: Class 3 AB- Onsite
Material Type: Aggregate Base
Impact By: Manuel Uy
Standard Count Density: 3062 g/cc
Count or Density 1: 6934 g/cc
Count or Density 2: 7601 g/cc
Count or Density 3: 8010 g/cc
Count or Density 4: 7753 g/cc
Count or Density 5: 7904 g/cc
Standard Count Moisture: 1068 g/cc
Moisture Count 1: 358 g/cc
Moisture Count 2: 319 g/cc
Moisture Count 3: 329 g/cc
Moisture Count 4: 304 g/cc
Moisture Count 5: 362 g/cc
Sum of Count or Density: 38202 g/cc
Average of Count or Density: 7640.4 g/cc
Sum of Moisture Count: 1672 g/cc
Average of Moisture Count: 334.4 g/cc
Calculated Percent Relative Compaction: 95.3 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/10/2023 ✔
