Summary for Test 2023-03-08-14-2
Test performed: AASHTO T30-19Project Information
Project Identifiers | Project ID: 215486 DEA: 040A0204 EFIS: 0400000129 |
---|---|
DIST-CO-RTE-PM | 04-SON-1-15-15.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Construct roadway and bridge with structural concrete and CIDH piling |
Location Description | District-County-Route-Post Mile: 04-Son-1-R15.0/R15.7 |
QA Service Level | 1 (Verified on 04/08/2022) |
Sample Information
Sample Taken Date | 03/08/2023 | Sample Unique Key | 14 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/08/2023 |
Sample type | Quality Assurance | A brief description of the sample | 3/4 HMA-SP Type A |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Jose | Last name of sampler or witnessed by | Roman |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Bodean - Santa Rosa | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Bodean Santa Rosa |
---|---|---|---|
Aggregate Size | 1/2 | Aggregate Source | |
RAP Stockpile | Continuous | Stockpile Size (tons) | |
Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2023-03-08-14
DIME Test ID: 2023-03-08-14-2
Testing Lab: CT D04 - Petaluma Field Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2023-03-22
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: Yes
Input Type: Measured
Tester's full name: Anthony Valdez
Date of test: 03/08/2023
Cumulative Mass Retained | Correction Factor | Cumulative Percent Passing | ||||
---|---|---|---|---|---|---|
1819 grams | ||||||
0 grams | 0 % | 100 % | ||||
0 grams | 0 % | 100 % | ||||
0 grams | 0 % | 100 % | ||||
0 grams | 0 % | 100 % | ||||
90 grams | -0.4 % | 95 % | ||||
260 grams | -0.1 % | 86 % | ||||
670 grams | -0.7 % | 62 % | ||||
982.2 grams | -0.6 % | 45 % | ||||
1218.7 grams | -1.1 % | 32 % | ||||
1364.2 grams | -1.5 % | 24 % | ||||
1527.1 grams | -1.9 % | 14 % | ||||
1618.9 grams | -1.7 % | 9 % | ||||
1684.3 grams | -1.4 % | 6 % | ||||
1685.5 grams |
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/22/2023 ✔