Summary for Test 2023-02-10-56-1
Test performed: AASHTO T308-10
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Please click this
link
to view the corrected test.
Project Information
Project Identifiers | Project ID: 215486 DEA: 040A0204 EFIS: 0400000129 |
---|---|
DIST-CO-RTE-PM | 04-SON-1-15-15.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Construct roadway and bridge with structural concrete and CIDH piling |
Location Description | District-County-Route-Post Mile: 04-Son-1-R15.0/R15.7 |
QA Service Level | 1 (Verified on 04/08/2022) |
Sample Information
Sample Taken Date | 02/10/2023 | Sample Unique Key | 56 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/10/2023 |
Sample type | Quality Assurance | A brief description of the sample | RAP |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Casey | Last name of sampler or witnessed by | Farrington |
Title of sampler | Plant QC | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Bodean - Santa Rosa | Transportation Laboratory (TL) Number | 101402 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Bodean Santa Rosa |
---|---|---|---|
Aggregate Size | Aggregate Source | ||
RAP Stockpile | Continuous | Stockpile Size (tons) | |
Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2023-02-10-56
DIME Test ID: 2023-02-10-56-1
Testing Lab: CT D04 - Petaluma Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-03-03
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Measured
Tester's full name: Anthony Valdez
Date of test: 02/10/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 3070.6 g
Mass of the specimen and specimen basket assembly prior to ignition: 4990.5 g
Mass of HMA Sample prior to ignition: 1919.9 g
Mass Loss: 130 g
Mass of aggregate remaining after ignition: 1789.9 g
Correction Factor (Percent by mass of HMA Specimen): 0 %
Moisture Content: 0 %
Temperature Compensation Factor: 0.16 %
Test Temperature: 482 F
Corrected Asphalt Binder Content: 6.61 %
General comments (publicly viewable) (Max 1000 characters): RAP lot 1 sublot 2
Test was verified on 3/3/2023 ✔