Summary for Test 2023-02-28-12-2
Test performed: CTM 504-June 2010Project Information
| Project Identifiers | Project ID: 215620 DEA: 01436404 EFIS: 0100000193 |
|---|---|
| DIST-CO-RTE-PM | 01-DN-101-35.8/36.5 |
| Award Date | 07/11/2022 |
| Closeout Date | Not set |
| Work Description | Dr. Fine Bridge Replacement |
| Location Description | DR. FINE BRIDGE REPLACEMENT FROM LAKE EARL DR TO S FRED D. HAIGHT DR ON HWY 101 ACROSS SMITH RIVER. |
| QA Service Level | 1 (Verified on 03/26/2021) |
Sample Information
| Sample Taken Date | 02/28/2023 | Sample Unique Key | 12 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 02/28/2023 | Sample type | Quality Assurance |
| A brief description of the sample | CIP Concrete | The quantity of what the sample constitutes | 46 CY |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Tance |
| Last name of sampler or witnessed by | Singletary | Title of sampler | ASR |
| Telephone number of sampler | 4074628500 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Tidewater Starry pit | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | DS-0001 | |
| Structure unique identifier | 01-0041 | Structure name | Dr Fine Temporary Bridge |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | SR3-8CIDH |
|---|---|---|---|
| The truck number from where the sample was collected | 109 | The batch plant ticket number from where the sample was collected | 57578 |
| Concrete batch plant | Stary Plant | The fabricator/manufacturer designation for the sample | |
| A detailed description of where the material sample was collected | CHUTE FROM TRUCK | Where the material sample would have been placed if not sampled | Temp Abutment 1 RT CIDH |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-02-28-12
DIME Test ID: 2023-02-28-12-2
Testing Lab: CT D01 - Crescent City Field Laboratory
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2023-03-01
Test Results
Input Type: Measured
Tester's full name: Tance Singletary
Date of test: 02/28/2023
Air Content: 2.2 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/1/2023 ✔
