Summary for Test 2023-02-01-32-1
Test performed: CTM 342-August 2012Project Information
| Project Identifiers | Project ID: 993424 DEA: 04281204 EFIS: 0400000769 |
|---|---|
| DIST-CO-RTE-PM | 04-NAP-29,221-5.5/6.7,0.0/0.2 |
| Award Date | 03/21/2022 |
| Closeout Date | Not set |
| Work Description | HMA, RDWY EXCAVATION, STRUCTURAL CONC AND MODIFYING LIGHTING SYSTEMS. |
| Location Description | NAPA COUNTY NEAR NAPA ON ROUTE 29 FROM 0.7 MILE SOUTH TO 0.5 MILE NORTH OF ROUTE 221 AND ON ROUTE 221 FROM 0.2 MILE NORTH OF ROUTE 29 TO ROUTE 29 |
| QA Service Level | 1 (Verified on 12/08/2021) |
Sample Information
| Sample Taken Date | 02/01/2023 | Sample Unique Key | 32 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/01/2023 |
| Sample type | Department Acceptance | A brief description of the sample | Roadway Material |
| The quantity of what the sample constitutes | ROADWAY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | HARISH | Last name of sampler or witnessed by | Thakur |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | SKID TEST | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | Not set |
|---|---|---|---|
| Type of Traffic Control Provided | Not set | DIST-CO-RTE | Not set |
| Direction of Travel | Not set | Post Mile | Not set |
| Lanes to be Tested | Not set | Station | Not set |
Test Details
DIME Sample ID: 2023-02-01-32
DIME Test ID: 2023-02-01-32-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-03-06
Test Results
Pavement or Bridge Deck?: Pavement
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 02/01/2023
Air Temperature: 55
Tire Pressure: 24
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: SUNNY
Direction/Lane #: SB: Southbound Direction of Travel
Edge used to measure reference distance: BEGIN ROADWAY
Edge used to measure position: LEFT OF GUTTER
Project Stationing 1: 80+00
Project Stationing 2: 105+00
Project Stationing 3: 130+00
Project Stationing 4: 155+00 ft
Project Stationing 5: 180+00 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Direction and Lane # for Stationing 4: no data
Direction and Lane # for Stationing 5: no data
Position for Stationing 1: 14
Position for Stationing 2: 14
Position for Stationing 3: 14
Position for Stationing 4: 14 ft
Position for Stationing 5: 14 ft
Percent Grade for 1st Stationing: -2.0
Percent Grade for 2nd Stationing: -3.0
Percent Grade for 3rd Stationing: -3.0
Percent Grade for 4th Stationing: -3.0 %
Percent Grade for 5th Stationing: -3.0 %
Corrected Coefficients of Friction for Stationing 1: 0.32
Corrected Coefficients of Friction for Stationing 2: 0.31
Corrected Coefficients of Friction for Stationing 3: 0.31
Corrected Coefficients of Friction for Stationing 4: 0.32
Corrected Coefficients of Friction for Stationing 5: 0.29
Average Coefficient of Friction: 0.31
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/6/2023 ✔