Summary for Test 2023-02-21-4-4

Test performed: CTM 557-July 2012

Project Information

Project IdentifiersProject ID: 993386
DEA: 060R1904
EFIS: 0614000057
COOP: 061783
DIST-CO-RTE-PM06-KER-184,223-L0.0/L0.3,R15.7/R16.3
Award Date01/25/2022
Closeout Date04/08/2024
Work DescriptionCONSTRUCT ROUNDABOUT, CURB RAMPS, AND LIGHTING SYSTEMS.
Location DescriptionKERN COUNTY NEAR ARVIN ON ROUTE 184 FROM ROUTE 223 TO 0.3 MILE NORTH OF ROUTE 223 AND ON ROUTE 223 FROM 0.3 MILE WEST OF ROUTE 184 TO 0.3 MILE EAST OF ROUTE 184
QA Service Level1 (Verified on 11/15/2021)

Sample Information

Sample Taken Date02/21/2023 Sample Unique Key4
Date that the sample was received by the laboratory/organization performing the testing02/21/2023 Sample typeDepartment Acceptance
A brief description of the samplePortland Cement Concrete The quantity of what the sample constitutesOne Wheel Barrel
From where was the sample collectedJob Site First name of sampler or witnessed byNeale
Last name of sampler or witnessed byBrown Title of samplerMaterials Tester
Telephone number of sampler6615498281 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameGolden Empire - Bakersfield
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberND 15518C
The truck number from where the sample was collected9210 The batch plant ticket number from where the sample was collected207291438
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedback of truck load 4 Where the material sample would have been placed if not sampledPAVEMENT SLAB
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-02-21-4
DIME Test ID: 2023-02-21-4-4
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement Concrete
Test Release Date: 2023-02-21

Test Results


Input Type: Measured
Tester's full name: Neale Brown
Date of test: 02/21/2023
Temperature of the freshly mixed concrete: 65 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/21/2023 ✔