Summary for Test 2023-02-15-30-1
Test performed: CTM 202-November 2011Project Information
| Project Identifiers | Project ID: 994087 DEA: 051G4104 EFIS: 0515000012 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-4.0/4.8 |
| Award Date | 09/02/2022 |
| Closeout Date | 08/12/2024 |
| Work Description | Santa Claus Lane Bike Path - !!Charge time to 05-0N72U4 per Project Manager / Corridor Manager!! |
| Location Description | !!Charge time to 05-0N72U4 per Project Manager / Corridor Manager!! |
| QA Service Level | 1 (Verified on 07/25/2022) |
Sample Information
| Sample Taken Date | 02/15/2023 | Sample Unique Key | 30 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/15/2023 |
| Sample type | Quality Assurance | A brief description of the sample | PCC Aggregates |
| The quantity of what the sample constitutes | 8 CY | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Darren | Last name of sampler or witnessed by | LaChaine |
| Title of sampler | Telephone number of sampler | 8056213616 | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Martin Marietta Goleta | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-42-0003 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Conveyor Belt | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | 725A1Z0P | Lot number | |
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-02-15-30
DIME Test ID: 2023-02-15-30-1
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-02-21
Test Results
What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Jesse Gomez
Date of test: 02/15/2023
| Sieve Size | Cumulative Percent Passing | |||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 100 % | ||||||
| 95 % | ||||||
| 62 % | ||||||
| 31 % | ||||||
| 5 % | ||||||
| 2 % | ||||||
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/21/2023 ✔