Summary for Test 2023-02-01-12-2
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 994092 DEA: 07339204 EFIS: 0717000119 |
|---|---|
| DIST-CO-RTE-PM | 07-VEN-118-0.7/11.0 |
| Award Date | 08/29/2022 |
| Closeout Date | 12/01/2023 |
| Work Description | REPLACE MINOR CONCRETE CURB RAMPS & MODIFY SIGNAL & LIGHTING SYSTEMS. |
| Location Description | VENTURA COUNTY IN AND NEAR OXNARD FROM DARLING ROAD TO ROUTE 34/118 SEPARATION |
| QA Service Level | 1 (Verified on 09/20/2022) |
Sample Information
| Sample Taken Date | 02/01/2023 | Sample Unique Key | 12 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/02/2023 |
| Sample type | Department Acceptance | A brief description of the sample | Subgrade |
| The quantity of what the sample constitutes | 15 sq. yd. | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Philip | Last name of sampler or witnessed by | Maquiran |
| Title of sampler | MREA | Telephone number of sampler | (213) 358-1518 |
| Laboratory sample identification | 23-0109 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Toro | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | From various locations at subgrade. | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-02-01-12
DIME Test ID: 2023-02-01-12-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2023-02-06
Test Results
Is oversize material: No
Input Type: Calculated
Tester's full name: Phillip Maquiran
Date of test: 02/02/2023
In-place wet density: 2.00
Highest adjust wet density: 2.19
% Moisture: 9.3 %
Optimum Moisture: 9.3 %
Relative compaction: 91
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/6/2023 ✔
