Summary for Test 2022-09-06-76-7
Test performed: CTM TEMP1-16Project Information
| Project Identifiers | Project ID: 212737 DEA: 060S8304 EFIS: 0615000046 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-5-44.4-45.4 |
| Award Date | 05/26/2022 |
| Closeout Date | 05/09/2025 |
| Work Description | TUMEY GULCH ABUTMENT REHAB BR# 42-0246L/R. |
| Location Description | IN FRESNO COUNTY AT TUMEY GULCH. |
| QA Service Level | 1 (Verified on 09/25/2018) |
Sample Information
| Sample Taken Date | 09/06/2022 | Sample Unique Key | 76 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/07/2022 |
| Sample type | Quality Control | A brief description of the sample | 4 x 8 concrete cylinders |
| The quantity of what the sample constitutes | Girder | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Roberto | Last name of sampler or witnessed by | Reyes |
| Title of sampler | QC Technician | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Con-Fab California, LLC | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Tumey Gulch Bridge | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | SCCS980F |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 2717 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Back of the truck Chute | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-09-06-76
DIME Test ID: 2022-09-06-76-7
Testing Lab: Con-Fab California, LLC
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2023-01-26
Test Results
Input Type: Calculated
Tester's full name: Roberto Reyes Perez
Date of test: 09/06/2022
Precast Maximum Curing Temperature: 151 °F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/26/2023 ✔
