Summary for Test 2013-10-18-8265-30

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 8127
DEA: 080N5904
EFIS: 0800000533
DIST-CO-RTE-PM08-SBD-40-R85.2
Award Date02/07/2013
Closeout Date05/11/2015
Work DescriptionCONSTRUCT PC/PS BULB-TEE GIRDER BRIDGE
Location DescriptionSAN BERNARDINO COUNTY NEAR ESSEX AT VAN WINKLE WASH BRIDGE
QA Service Level1 (Verified on 12/10/2012)

Sample Information

Sample Taken Date10/18/2013 Sample Unique Key8265
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing10/16/2013
Sample typeQuality Control A brief description of the sampleWCS at 110 Yards
The quantity of what the sample constitutes1 bag From where was the sample collectedSource
First name of sampler or witnessed byDustin Last name of sampler or witnessed byRogers
Title of samplerField Technician Telephone number of samplerNot set
Laboratory sample identificationNot set Linked DIME Sample IDNot set
The fabricator/manufacturer/facility nameHi-Grade Joshua Tree Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)WCS at 110 Yards
The fabricator's/manufacturer's product name for the sampleNot set The fabricator/manufacturer designation for the sampleNot set
The plant numberNot set A detailed description of where the material sample was collectedHi-Grade Joshua Tree
Where the material sample would have been placed if not sampledNot set Primary Aggregate Nominal Size
The concrete mix design number Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2013-10-18-8265
DIME Test ID: 2013-10-18-8265-30
Testing Lab: SCST, LLC
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2013-10-25

Test Results


Number of tests: 1
Input Type: Calculated
Tester's full name: Tony Stewart
Date of test: 10/18/2013
Temperature correction: no data
Temperature of solution: no data
Clay reading (test 1): no data
Sand reading (test 1): no data
Sand equivalent (test 1): no data
Sand equivalent before temperature correction: no data
Sand equivalent after temperature correction: 81
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/25/2013